Agencies » Boston MBTA

 •  Red Line

 
Stops
 
Red Line Ashmont Branch: Service between JFK/UMass and Ashmont is operating with two shuttle trains through April 30 to allow for critical track work. Riders will experience longer wait times for trains and should plan extra travel time. Started Thu Apr 10 Until Thu May 1
More...

Jump to: North

Ashmont (Express)
JFK/UMass
Savin Hill
Ashmont
Ashmont
Alewife
Davis
Porter
Harvard
Central
Kendall/MIT
Charles/MGH
Park Street
Downtown Crossing
South Station
Broadway
Andrew
JFK/UMass
Savin Hill
Fields Corner
Shawmut
Ashmont
Braintree
Alewife
Davis
Porter
Harvard
Central
Kendall/MIT
Charles/MGH
Park Street
Downtown Crossing
South Station
Broadway
Andrew
JFK/UMass
North Quincy
Wollaston
Quincy Center
Quincy Adams
Braintree
Alewife
Braintree
Quincy Adams
Quincy Center
Wollaston
North Quincy
JFK/UMass
Andrew
Broadway
South Station
Downtown Crossing
Park Street
Charles/MGH
Kendall/MIT
Central
Harvard
Porter
Davis
Alewife
Jfk/Umass (Express)
Ashmont
Savin Hill
JFK/UMass
Alewife
Ashmont
Shawmut
Fields Corner
Savin Hill
JFK/UMass
Andrew
Broadway
South Station
Downtown Crossing
Park Street
Charles/MGH
Kendall/MIT
Central
Harvard
Porter
Davis
Alewife
North Quincy Newport Avenue Parking Lot closed beginning Wed Oct 16 due to construction. The vehicle entrance and exit will relocate to the old “state street” driveway. Public access via stairs/escalators to the lobby is restricted. Elevator access only. Started Wed Oct 16 2024
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1
Alewife Garage: Beginning Monday, April 7, the vehicle exit will temporarily relocate to the third level. This is to accommodate ongoing construction in the garage. Started Mon Apr 7