Agencies » Boise VRT
• 3-Vista
Due to detour, inbound stops at Capitol and University, Capitol and Cesar Chavez, and Capitol and River will be closed until further notice. Temporary stop will be placed at Capitol and Boise Ave.
Due to construction on State and Pierce Park area both stops on inbound and outbound sides are closed and no temp stops.
Jump to: ↑North
|
Routes at 9th & Grove stop downstairs at Main Street Station effective 8/23. Visit ridevrt.org/news for more information.
Inbound stop at Vista and Overland is closed due to construction work. Temp stop placed near side Vista & Dorian.
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
Route Performance Chart
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
View Route Tracking History
See a list of trips for a route or a vehicle.
Message/Alert History
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
Passenger Load Chart
See the distribution of each passenger load level by stop for a branch.
Route Delay Map
Map of locations where vehicles are delayed along the route.
Choose Stop for Stop History
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose Stops for Link Times
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.