Agencies » Phoenix Valley Metro
• 3-Van Buren St
Jump to: ←West
|
Additional Stops:
April service changes: schedule adjustments Starts Mon Apr 28 Until Mon May 12
Starting Monday, April 28, schedule adjustments for the following routes will take effect: 3, 7, 12, 13, 16, 17, 19, 29, 30, 39, 43, 50, 56, 70, 75, 77, 81, 83, 90, 128, 154, 184, 186, 514 and MARz.
Starting Monday, April 28, schedule adjustments for the following routes will take effect: 3, 7, 12, 13, 16, 17, 19, 29, 30, 39, 43, 50, 56, 70, 75, 77, 81, 83, 90, 128, 154, 184, 186, 514 and MARz.
Rt. 3 Bus Stop Moved- Van Buren Street Construction Started Mon Jan 1 2024 Until Wed Dec 31 2025
More...
More...
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.