Agencies » Phoenix Valley Metro
• 1-Washington St
Jump to: ←West
|
|
South Central Extension/Downtown Hub opens on June 7 Starts Sat Jun 7
On June 7 at 9:30 a.m., Valley Metro Rail expands with eight new stations and 5.5 more miles of service. A new two-line system begins with trains every 12 minutes on weekdays with transfers at the Downtown Phoenix Hub. Learn more: valleymetro.org/two-line.
On June 7 at 9:30 a.m., Valley Metro Rail expands with eight new stations and 5.5 more miles of service. A new two-line system begins with trains every 12 minutes on weekdays with transfers at the Downtown Phoenix Hub. Learn more: valleymetro.org/two-line.
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.