Agencies » Portland TriMet
• 8-Jackson Park/NE 15th
Beginning Saturday, April 5, through Friday, April 18, no service at eastbound stop NE Multnomah & 11th (Stop ID 9305) due to construction. No temp stop. Started Fri Apr 4 Until Sat Apr 19
Started Sat Apr 5 Until Sat Apr 19
Beginning Wednesday, April 2, through Friday, April 18, no service to the southbound stop at NE 15th & Weidler (Stop ID 6779) due to construction. Started Tue Apr 1 Until Sat Apr 19
No service to the stops at 700 SW Campus Dr at Doernbecher (Stop ID 10176) and SW Campus Dr & Casey Eye Institute (Stop ID 14093) due to long-term construction. Use the stop at SW Terwilliger & Sam Jackson. Started Tue Jul 9 2024
Jump to: ↑North
|
|
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.