Agencies » AC Transit
• 6-Berkeley - Telegraph - Oakland
Jump to: ↑North
|
|
Uptown Transit Center Stops Closed
Due to: Construction
Effective: September 2 – 8
Please see the AC Transit website for more information: https://www.actransit.org/node/25713
---
Cierre de las paradas en Uptown Transit Center
Debido a: Trabajos de construcción
Efectivo: 2 – 8 de Septiembre
Por favor visite la página web de AC Transit para más información: https://www.actransit.org/es/node/25713
---
Uptown Transit Center 交叉口站暂停服务
由于: 施工
生效日期: 9 月 2 日至 8 日
更多详情,请参考 AC Transit 的网站: https://www.actransit.org/zh/node/25713
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
Route Performance Chart
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
View Route Tracking History
See a list of trips for a route or a vehicle.
Message/Alert History
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
Passenger Load Chart
See the distribution of each passenger load level by stop for a branch.
Route Delay Map
Map of locations where vehicles are delayed along the route.
Choose Stop for Stop History
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose Stops for Link Times
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.