Agencies » Vernon Regional Transit System

Started Mon Feb 2 Until Thu Oct 1
Route: 1-Coldstream/Downtown
Route 1 Detour - due to construction on lower Aberdeen Road. Bus will turn left at Aberdeen Rdb then right onto Hwy #6 to Kalamalka Road by Coldstream Ranch and resume regular routing on Kalamalka Road Started Mon Feb 2 Until Thu Oct 1
Route: 1-Coldstream/Downtown
Stop Closure Started Mon Mar 2
Route 3 Stop ID 144082 outbound (43 Ave & 35 St) will be closed from Febuary 02, 2026 to an undetermined date due to construction on Alexis Park Dr and 43 Ave.
A temporary stop will be located 100m away on 35 St south of 43 Ave beginning July 6.
Route: 3-North End/Downtown
DETOUR Route 4 Started Mon Jun 29
Route 4 is on detour 24/7 until further notice due to a road closure on 18 St from Pottery Rd to 21 Ave however there are no closed bus stops.

Route 4 will continue east bound past 18 St to 15 St turning left; turning left onto 21 Ave; turning right onto 18 St and back to regular routing.
Route: 4-East Hill
Route 3 Stop Closure Starts Mon Jul 13 Until Tue Jul 13 2027
Route 3 outbound Stop ID 144081 (Alexis Park & 42 Ave) will be closed from July 6, 2026 to an undetermined date due to construction on Alexis Park Dr and 43 Ave.
A temporary stop will be located 100m away at 42 Ave and 35a St.
Route: 3-North End/Downtown