Beginning June 23, and continuing for approximately two months, Sound Transit will be replacing waterproofing around platform drains on Wilburton Station platform, requiring temporary elevator closures. Started Mon Jun 23 Until Mon Sep 1 The work will begin at the elevator at the south end of Wilburton station (Exit B), and this elevator will be closed for approximately one month. Following completion of work at the south end and return to service of that elevator, work will begin at the elevator at the north end of Wilburton station (Exit A). Project completion is anticipated by Fall 2025.
The work schedule is subject to change. For updates, passengers should subscribe to service alerts for accessibility. You can also sign up for station-specific updates. Visit the service alerts web page to sign up for alerts and current information on service disruptions.
If you need assistance in a Sound Transit station, please call or text Security at (206) 398-5268. If you need specific trip planning support, please call Passenger Care at 1-888-889-6368 (Mon-Fri, 8 a.m.-6 p.m.). More...
The elevators are in service at these specified times. Please use alternate elevators when these elevators are not in service.
On certain weekends and evenings, the Benaroya Hall Boeing Gallery will offer access to Symphony Station from 2.5 hours prior to any public event through its conclusion. See the Seattle Symphony’s calendar of Benaroya Hall events for dates and times of public events.
Kent Station - Elevator 5 unavailable until further notice due to maintenance. The elevator serving the street (Track 2) and pedestrian bridge to Track 1 is out of service until further notice.
See below for alternate route information. Started To ride the Sounder from the pedestrian bridge:
1. Return to the Kent Station parking garage.
2. Take the elevator down to the street.
3. Passengers can access track 1 from 1st Ave N.
To Track 2:
1. Follow the pedestrian walkway toward E Smith St.
2. Cross E Smith St at the crosswalk.
3. Follow the pedestrian walkway to track 2.
Please use caution when crossing the tracks.More...
Route: SNDR_TL
Elevator outage at Wilburton Station. The elevator at Exit B serving the street (NE 8th ST & 118th Ave NE) is out of service.
See below for alternate route information. Started Mon Jun 23 Until Fri Jul 25 To ride the 2 Line:
1. Go to the opposite end of the station.
2. Take the elevator at Exit A up to the platform.
To exit the station:
1. Go to the opposite end of the platform.
2. Take the elevator down to the street.More...
Route: 2 Line-South Bellevue - Downtown Redmond
Elevator and Escalator upgrades at Int'l Dist/Chinatown Station Started Sat May 24 Sound Transit continues to upgrade elevators and escalators at International District/Chinatown Station. See below for current service status during the improvement process.
Exit A - to 5th Ave S & S Jackson St:
• Elevator 901 to Lynnwood platform – in service
• Elevator 902 to Angle Lake platform – in service
• Escalator 901 from Lynnwood platform – out of service
• Escalator 902 from Angle Lake platform – out of service
Exit B – to 5th Ave S & King St:
• Elevator 904 to Angle Lake platform – in service
• Escalator 903 from Lynnwood platform – in service
• Escalator 904 from Angle Lake platform – in service
• Elevator 903 to Lynnwood platform – out of service
• Southeast stairwell to/from Lynnwood platform – closed
Passengers who need assistance while at a Sound Transit station, can call or text Security at (206) 398-5268.More...
Route: 1 Line-Lynnwood - Angle Lake
Int'l Dist/Chinatown Station - Elevator 903 unavailable until further notice due to planned maintenance. The elevator at Exit B serving the street (5th Ave S & S King St) and Lynnwood platform is out of service. Started Tue May 27 To ride the 1 Line to Lynnwood:
1. Continue on 5th Ave S toward S Jackson St.
2. Take the elevator down to the Lynnwood platform.
To exit the station:
1. Go to the opposite end of the platform toward Exit A.
2. Take the elevator up to the street.More...
Route: 1 Line-Lynnwood - Angle Lake
SeaTac Airport Station 2nd pedestrian bridge elevator construction begins January 8, 2025. Started Wed Jan 8 2025 Beginning January 8, 2025, through 2026, construction will take place at SeaTac Airport Station to add a new elevator to the pedestrian bridge. The new elevator will provide an additional option for passengers to travel from the pedestrian bridge to the pickup/drop off parking lot adjacent to the station. During construction, passengers can expect pedestrian walkways to occasionally be blocked or narrowed, and access to the current elevator periodically interrupted.
During times where pedestrian walkways are blocked and elevator access is unavailable, passengers may catch the Rapid Ride A Line bus from SeaTac Airport Station to Tukwila International Boulevard Station in order to use the 1 Line.
The pedestrian bridge from the station to the airport will be unaffected and available throughout the duration of this project.
Beginning February 10, 2025 half of the passenger pick up/drop off area will be closed, as will some parts of the plaza near the stairs and existing elevator as equipment begins to come in for construction of the new elevator.
Additional information about changes in elevator accessibility will be provided as it comes available.More...
Route: 1 Line-Lynnwood - Angle Lake
Int'l District Station will have scheduled maintenance Monday, June 16 through Friday, July 18. The work will take place from 10:00 p.m. to 5:00 a.m. daily. Started Mon Jun 16 Until Fri Jul 18 Stairwells will be closed one at a time to facilitate repair, cleaning and water intrusion mitigation.
Service will not be impacted and the opposite stairwell will remain open as well as no impact to escalators.
Please use caution when navigating the platform during hours of maintenance.
N Line & S Line trains could experience delays of up to 10 minutes or more due to high temperatures forecasted over the next few days. Started Wed Jul 16 Until During times of excessive heat, it is required that train tracks are inspected frequently and Sounder trains operate at a reduced speed. While necessary precautions to take for public safety, these factors will cause some delays to the system.
We understand this may result in more crowded conditions than usual, and we appreciate your patience and understanding. If you prefer a more comfortable ride during this period, you may wish to consider alternate train options. Thank you for your continued support and flexibility.More...
Route: SNDR_TL
Partial closure of east stairwell at South Bellevue Station Garage Started Tue May 20 The east stairwell in the center of the South Bellevue Station Garage is partially closed until further notice. The closure affects those traveling between floors, three, four, and five. To exit the garage, please use the stairwells located along the perimeters in the north and south ends.
From Monday, July 7 through Friday, July 18 construction activity will occur near Northgate Station to replace sidewalk ramps. Started Mon Jul 7 Until Sun Jul 20 Construction work will take effect daily from 7 p.m. – 4 a.m., limiting access to ramps near Northgate Station on NE 103rd St and NE 100th St. Crews will demolish the current ramps and rebuild them in four locations to improve accessibility for safer slopes and street access from sidewalks. The work will not have any impact on 1 Line service.
- July 7–11: impacts at 3 locations
• Closure of the crosswalk along the south side of NE 103rd St, just east of the station plaza. Crosswalk at parking garage to the east to remain open.
• Rebuilding of curb ramp at the southeast corner of 1st Ave NE and NE 100th St. Closure of the crosswalk along the east side of 1st Ave NE. Use the pathway through adjacent parking lot to crosswalk east of 1st Ave NE;
• Rebuilding of first half of curb ramp at the southeast corner of 1st Ave NE and N 103rd St. Crosswalk to remain open.
- July 14–18: impacts at NE 103rd St along the east side of 1st Ave NE
• Rebuilding the second half of curb ramp at the southeast corner of 1st Ave NE and NE 103rd St. Crosswalk to remain open;
• Closure of crosswalk across NE 103rd St along the east side of 1st Ave NE. Rebuilding curb ramp at the northeast corner of 1st Ave NE and NE 103rd St. Crosswalk to be closed. Crosswalk at parking garage to the east to remain open. Signage (Contractor provided) to indicate alternative pathways on site.
Please be aware the work schedule is subject to change.
Those who frequent the station and live in the area may experience noise related to the nightly construction work.
For those needing help while at a Sound Transit station, please call or text Security at (206) 398-5268.
For updated information, passengers should subscribe to station-specific service alerts. Visit our service alerts web page at https://www.soundtransit.org/alerts to sign up and find current information on service disruptions.
-S Line train will depart Lakewood at 10:11 a.m. and depart King Street Sta 45 minutes after the game ends.
-N Line train will depart Everett at 10:45 a.m. and depart King Street Sta 45 minutes after the game ends.
Want to spread out a bit on your Sounder S Line ride to the game? Head for the northernmost train cars—they're usually a lot less crowded!