Agencies » Philadelphia SEPTA

Trolley Tunnel Closed Overnight - Service Diverted to 40th & Market Streets Started Fri Mar 20
Trolleys are on diversion to 40th and Market Streets every night from 10 pm until 5 am until further notice to allow for inspections and maintenance work. Passengers can connect to the L Line for continued service to/from Center City.
Routes: T1-13th St to 63rd-Malvern/Overbrook, T2-13th St to 61st-Baltimore/Angora, T3-13th St to Yeadon or Darby TC, T4-13th St to Darby Transit Center, T5-13th St to 80th St/Eastwick
Shuttle Busing Between Bridgeport Station and Norristown Transit Center Started Sun Mar 29 Until Sat May 9
To support a major rehabilitation project on the Bridgeport Viaduct, bus service replaces train service from Bridgeport Station to Norristown Transit Center until Saturday, May 9. Passengers should plan for an increase in travel time. For project details and schedules, visit septa.org. Shuttle bus information is available on a separate M1 Shuttle Bus schedule page.
Route: M1-Norristown High Speed Line Local
Shuttle Busing Between 69th Street Transit Center to Orange Street/Sharon Hill Stations Starts Sat May 9 Until Sun May 31
Bus service replaces trolley service for the entirety of the Routes D1 and D2 during all weekends through May 2026. Passengers should allow an additional 15 minutes of travel time. For details and schedules, visit septa.org. Shuttle bus information is available on separate D1 bus & D2 bus schedule pages.
Routes: D1-Route 101, D2-Route 102
Eastbound service is experiencing additional wait times of up to 15 minutes between trains due to earlier mechanical issues at 46th Street Station. Started
Eastbound service is experiencing additional wait times of up to 15 minutes between trains due to earlier mechanical issues at 46th Street Station.
Route: L1-Market-Frankford Line All Stops
Bus Stop Location Changes Started Sun Feb 22
Route K has been re-routed as of February 22. Eastbound service will no longer operate on Queen Ln. Eastbound buses will operate on Midvale Ave. to Coulter St., then to Wayne Ave. Westbound service remains the same on Penn St., King St. and Queen Ln. Service still connects to the Regional Rail Queen Lane Station in both directions.
Route: K-Ridge-Midvale to Arrott Transit Ctr
Street Paving Started Until
Until 06:00am on 5/6/2026, NB via Arch, Right on 16th, L - Vine, Take Ben Franklin Parkway, Outter lanes, Right on 22nd, Reg Rt
Route: 48-Front-Market to 27th-Allegheny
Construction Started Until
Until 6:00AM, EB via Market, Left on 35th, Right on Market, Right on 34th, Left on Chestnut, Reg Rt
Route: 21-Columbus-Dock to 69th St TC
Road Closed Started Tue May 5 Until
Until 10am on 5/6/26, EB via Grays Ferry, Stay on Grays Ferry, Reg Rt
Route: 64-50th-Parkside to Pier 70
Construction Started Mon May 4 Until
Until 10am 5/6/26, SB via Aramingo, Right on York, Left on Memphis, Reg Rt
Route: 25-Frankford TC to Columbus Commons
Construction Started Mon May 4 Until
Until 10am 5/6/26, NB via Frankford av, Right on Norris, Left on Cedar, Left on York, Right on Trenton, Left on Huntingdon, Right on Frankford, Reg Rt
Route: 5-2nd-Market to Frankford Transit Ctr
Construction Started Mon May 4 Until
Until 10am 5/6/26, SB via Frankford av, Left on Lehigh, Right on Aramingo, Right on York, Left on Memphis, Right on Palmer, Left on Frankford, Reg Rt
Route: 5-2nd-Market to Frankford Transit Ctr
Construction Started Tue May 5 Until Wed May 6
Tues - Weds 9:00 am - 3:00, pm, EB via Broad, Right on Chew, Right on Park, Reg Rt
Route: 8-Olney TC to Frankford TC
Bus shelter construction Started Tue May 5 Until Wed May 6
9am - 3pm until Weds, 5/6/26, WB via Olney Ave, Right on 12th St, Left on Chew Ave, Left on Broad St, (Pick up passengers at, Broad & Olney)
Routes: 18-Fox Chase to Cedarbrook Plaza, 26-Frankford TC to Chelten Av Station
Peco Started Tue May 5 Until Wed May 6
7am - 4pm until Weds, 5/6/26, NB via 11th St, Right on Diamond St, Left on 9th St, Left on Germantown Ave, Reg Rt
Route: 23-11th Market to Chestnut Hill
Construction Starts Until Wed May 6
7am - 4pm on 5-6-26, SB via Grays Ferry, Right on Washington, Right on 25th, Right on Snyder, Left on 29th, Reg Rt
Route: 49-33rd-Dauphin to 29th-Snyder
PECO Started Until Thu May 7
Until 07:00am on 5-7-26, EB via Market, Right on 63rd, Left on Chestnut, Left on 60th, Right on Market, Reg. Rt.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
PECO Started Until Thu May 7
Until 07:00am on 5-7-26, EB via Market, Right on 61st, Left on Chestnut, Left on 60th, Right on Market, Reg. Rt.
Route: 31-City Hall to 76th-City
Discontinued Transit Stop Started Tue May 6 2025 Until Fri May 8
Until further notice, NB transit stop at Dekalb, Pk & Township Line Rd has, been Discontinued,, Effective Immediately
Route: 96-Lansdale to Norristown Transit Ctr
Construction Started Mon Apr 6 Until Fri May 8
7pm - 5am until 5/8/26, WB via Malvern, Right on 64th, Left on Lebanon, Left on 63rd, Right on Malvern, Reg Rte
Route: 105-Rosemont to 69th St Transit Center
Construction Started Mon Apr 6 Until Fri May 8
7pm - 5am until 5/8/26, EB via 63rd, Right on Lebanon, Right on 64th, Left on Malvern, Reg Rte
Route: 105-Rosemont to 69th St Transit Center
Construction Started Mon May 4 Until Fri May 8
Until 3pm 5/8/26, NB Transit Stop, Discontinued, at Academy rd & Ryan Dr
Route: 20-Philadelphia Mills to Frankford TC
Construction Started Mon May 4 Until Fri May 8
Until 3pm 5/8/26, SB Transit Stop, Discontinued, at Academy rd & Ryan Dr
Route: 67-Phila Mills/Bustletn to Frankfrd TC
Construction Started Tue May 5 Until Fri May 8
7am - 3pm until Fri 5/8/26, SB via Wayne Ave, Left on Washington Ln, Right on Greene St, Reg Rt
Route: 71-Broad-Erie to Cheltenham-Ogontz
Construction Started Tue May 5 Until Fri May 8
7am - 3pm until Fri 5/8/26, NB via Greene St, Left on Washington Ln, Right on Wayne Ave, Reg Rt
Route: 71-Broad-Erie to Cheltenham-Ogontz
PGW Starts Until Fri May 8
7am - 3pm until Fri 5/8/26, WB via Mt Pleasant Ave, Left on Williams Ave, Right on Roumfort Rd, Right on Cheltenham Ave, Reg Rt
Route: 18-Fox Chase to Cedarbrook Plaza
PGW Starts Until Fri May 8
7am - 3pm until Fri 5/8/26, EB via Cheltenham Ave, Left on Roumfort Rd, Left on Thouron Ave, Reg Rt
Route: 18-Fox Chase to Cedarbrook Plaza
PGW Started Mon Apr 27 Until Fri May 8
7am - 4pm, Mon - Fri until 5/8/26, SB via 29th St, Left on Allegheny Ave, Right on 27th St, Right on Chalmers, Reg Rt
Route: 32-Broad-Carpenter to Ridge-Lyceum
PGW Started Mon Apr 27 Until Fri May 8
7am - 4pm, Mon - Fri until 5/8/26, NB via Chalmers, Left on 27th St, Left on Allegheny Ave, Right on henry Ave, Reg Rt
Route: 32-Broad-Carpenter to Ridge-Lyceum
PGW Started Mon Apr 27 Until Fri May 8
7am - 4pm Mon thru Fri, 5-8-26, NB via 29th, Right on Charmers, Left on 29th, Reg Rt
Route: 48-Front-Market to 27th-Allegheny
PGW Started Mon Apr 27 Until Fri May 8
7am - 4pm Mon thru Fri, 5-8-26, SB via 27th, Right on Allegheny, Right on 26th, Right on Clearfield, Left on 27th, Right on Charmers, Left on 29th, Reg Rt
Route: 48-Front-Market to 27th-Allegheny
PECO Started Mon May 4 Until Fri May 8
7am - 4pm until 5-8-26, NB via 22nd, Left on Snyder, Right on 25th, Right on Washington, Left on 22nd, Reg Rt
Route: 7-Pier 70 to 33rd-Dauphin
Construction Started Wed Apr 22 Until Fri May 8
weekdays only 5/08/26, NB transit stop disontinued, Bethlehem & Newton, due to construction.
Routes: 94-Montgomery Mall to Chestnut Hill, 51-Plymth Mtg/Chestnt Hill to Olney TC
Plumbing Contractor Started Mon May 4 Until Sat May 9
7:00pm to 4:00am, Monday thru Friday, Until Saturday 05/09/2026, EB via Locust St, Left on 11th St, Right on Chestnut St, Right on 2nd St to 38th Parallel, Place, Right on Spruce St, Reg Rte
Route: 12-Columbus-Dock to 50th-Woodland
Construction Started Mon May 4 Until Sat May 9
7am - 4pm Until 5/9/26, SB via 12th, Left on Locust, Right on 10th, Right on Spruce, Left on 12th, Reg Rt
Route: 45-Broad-Oregon to 12th-Vine
Construction Started Wed Apr 22 Until Mon May 11
Weekdays Only 7:00 am -, 3:00 pm until 5/11/26, Discontinue transit stop, Westbound @ 4th &, Washington
Route: 64-50th-Parkside to Pier 70
Road Closed Started Tue May 5 Until Fri May 15
7am -5pm, Mon - Fri until 5/15/26, WB via Grays Ferry, Stay on Grays Ferry, Reg Rt
Route: 64-50th-Parkside to Pier 70
Construction Started Until Sun May 17
Until 11:59pm 5/16/26, SB via 8th, Slow operation on 8th Btw, Porter & Oregon
Route: 47-Whitman Plaza to 5th-Godfrey
Construction Started Tue May 5 Until Fri May 22
Monday - Friday 7am -, 4pmUntil 5/22/26SB via, Radcliffe StStay on, Radcliffe St to Jefferson, Reg Rt
Route: 128-Neshaminy to Oxford Valley Mall
Construction Started Tue May 5 Until Fri May 22
Monday - Friday 7am -, 4pmUntil 5/22/26, NB via Radcliffe StStay on, Radcliffe St to MonroeReg, Rt
Route: 128-Neshaminy to Oxford Valley Mall
PECO Started Mon May 4 Until Sat May 30
7pm to 4am M-F, Until 5-30-26, SB Via 19th, Left on Market, Right on 15th, Left on South Penn, Right on Broad, Right on Walnut, Reg Rt
Route: 17-Front-Mkt to 20-Johnston/Broad-Pat
Construction Started Wed Feb 25 Until Sun May 31
Until 4:30 5/31/26, WB via 2nd, Right on Arch, Left on 6th, Right on Market, Reg Rt
Route: L1 OWL-Midnight-5am Service (Bus) for L1
construction Started Thu Mar 26 Until Sun May 31
Until 5am on 05/31/26, EB via Wingohocking, Left on Broad, Right on Wyoming, Reg Rte
Route: 75-Wayne Junct to Arrott Transit Ctr
30th St Barrier Replacement Started Wed Mar 25 Until Sun May 31
Until 4pm on 5/31/26, WB via JFK Blvd, Right on Market, Reg Rt
Route: 30-Gray 30th St Station to 69th St TC
Center Barrier Installation Started Wed Mar 25 Until Sun May 31
24/7 until 4pm on Sun, 5/31/26, EB via 30th, R JFK, Left on Market, Reg Rt
Route: 44-Front-Market to Ardmore
Center Barrier Installation Started Wed Apr 1 Until Sun May 31
24/7 until 4pm on 5/31/26, SB via 30th, Right on JFK, Left on Market St, Reg Rt
Route: 62-9th-Market to Andorra
Center Barrier Installation Started Wed Mar 25 Until Sun May 31
24/7 until 4pm on Sun, 5/31/26, SB via 30th St, Right on JFK Blvd, Left on Market St, Right on 23rd, Left on Chestnut, Reg Rt, ( Alight Passengers on 30th, st Before JFK Blvd )
Route: 9-4th-Walnut to Andorra
Center Barrier Installation Started Wed Mar 25 Until Sun May 31
24/7 until 4pm on 5/31/26, EB via 30th st, ( Stay In The Right Lane ), Right on JFK, Left on Market St, Reg Rt
Routes: 124-Chesterbrook to 13th-Market, 125-Valley Forge to 13th-Market
30th & Market Barrier Installation Started Wed Mar 25 Until Sun May 31
Until 4pm on 5/31/26, EB via Market, Left on Schuylkill, Left on Arch, Right on JFK, Layover under the bridge
Route: 30-Gray 30th St Station to 69th St TC
Contractors Started Wed Apr 29 Until Sun May 31
Until 5pm on 5/31/26, NB via Lincoln Dr, Right on Mt Pleasant, Reg Rt
Route: 71-Broad-Erie to Cheltenham-Ogontz
Contractors Started Wed Apr 29 Until Sun May 31
Until 5pm on 5/31/26, SB via Mt Pleasant, Left on Lincoln Dr, Reg Rt
Route: 71-Broad-Erie to Cheltenham-Ogontz
Construction Started Mon Apr 27 Until Sun May 31
Monday -Friday, Until 5pm 5/31/26, SB via 62nd St, Right on Grays Ave, Left on 63rd St, Left on Elmwood Ave, Right on 62nd St, Reg Rt
Route: 63-Lanknau/Overbrk to ColCom/FdCtr
Construction Started Mon Apr 27 Until Sun May 31
Monday -Friday, Until 5pm 5/31/26, NB via 62nd St, Left on Elmwood Ave, Right on 63rd St, Right on Grays Ave, Left on 62nd St, Reg Rt
Route: 63-Lanknau/Overbrk to ColCom/FdCtr
Construction Started Wed Mar 25 Until Sun May 31
Until 10pm on 05/31/26, EB via Market, Left on Schuylkill, Left on Arch, Left on 30th, Right on Jfk, LayOver Schuylkill Yard, Bridge
Routes: LUCYGO-Gold Loop through University City, LUCYGR-Green Loop through University City
PENNDOT Started Wed Mar 25 Until Mon Jun 1
7pm - 430am 6-1-26, 24-7 , WB via JFK, Right on Market, Reg Rt
Route: 30-Gray 30th St Station to 69th St TC
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, SB via Batram, Left on Tinicum, Left on 89th, Right on Driveway to PNC Bus, Shelter at 88th, Left on 88th, Left on Bartram, Reg Rt
Route: 68-Broad-Oregon to UPS/69th St TC
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, NB via Bartram R - 89th, St,R – Driveway to PNC Bus, Shelter at 88th, L – 88th St, R, – Tinicum Blvd, R – Bartram, Reg Rt
Route: 68-Broad-Oregon to UPS/69th St TC
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, WB via Bartram, L – Tinicum Blvd, L – 89th St,, R – Driveway to PNC Bus, Shelter at 88th, L – 88th St, L –, Bartram, Reg Rt
Route: 37-Chester Transit Ctr to Broad-Snyder
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, EB via Bartram, Right on 89th St,, R – Driveway to PNC Bus, Shelter at 88th, L – 88th St, R, – Tinicum Blvd, R – Bartram, Reg RT
Route: 37-Chester Transit Ctr to Broad-Snyder
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, EB via PNC Bus Shelter at, 88th, L – 88th St,, R – Tinicum Blvd, R –, Bartram, Reg Rt,, PNC Trips (Weekends, Only)
Route: 37-Chester Transit Ctr to Broad-Snyder
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, WB via Bartram L – Tinicum, Blvd, L – 89th St, R –, Driveway to PNC Bus, Shelter at 88th, Take, Recovery.,, PNC Trips Weekends Only
Route: 37-Chester Transit Ctr to Broad-Snyder
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, NB via Bartram, Left on Tinicum, Left on 89th, Right on Driveway to PNC shelter, at 88th Take Recovery,, PNC Trips Weekends Only
Route: 68-Broad-Oregon to UPS/69th St TC
PNC Construction Started Thu Mar 26 Until Mon Jun 1
until 6-1-26 430am, SB via PNC Bus Shelter, @88th, Left on 88th, Right on Tinicum, Right on Bartram, Reg Rt,, PNC Trips Weekends Only
Route: 68-Broad-Oregon to UPS/69th St TC
PENNDOT Started Wed Mar 25 Until Mon Jun 1
7pm - 430am 6-1-26, 24-7 , EB via Market, Left on Schuykill, Left on Arch, Right on JFk, Layover on JFK
Route: 30-Gray 30th St Station to 69th St TC
Discontinued Passenger Stop Started Wed Apr 15 Until Mon Jun 1
EB Route 31, Discomntinue Transit Stop, at 34th & Market, Until 6-1-2026
Route: 31-City Hall to 76th-City
Construction Started Tue Apr 21 Until Mon Jun 1
7am -3pm Mon thru Sat, until 6-1-26, NB via Bustleton, L-Rennard, Right on Ferndale, Left on Hendrix,, Left on Rennard, Lay Over at Rennard &, Hendrix then - Reg Rt S/B, Tomlinson Trips Only
Route: 58-Neshaminy/Somerton to Frankford TC
Roadwork Started Thu Mar 26 Until Mon Jun 1
Sun - Sat until 4pm on 6/1/26, SB via Bartram Ave, Left on Tinicum Blvd, Left on 89th St, Right on Driveway to PNC bus, Shelter at 88th, Left on 88th, Left on Bartram Ave, Reg Rt
Route: 108-UPS/Airport to 69th St Transit Ctr
Roadwork Started Thu Mar 26 Until Mon Jun 1
Sun - Sat until 4pm on 6/1/26, NB via Bartram Ave, Right on 89th St, Right on Driveway to PNC Bus, shelter at 88th St, Left on 88th St, Right on Tinicum Blvd, Right on Bartram Ave, Reg Rt
Route: 108-UPS/Airport to 69th St Transit Ctr
PWD Started Mon Apr 27 Until Mon Jun 1
9am - 430pm until 6-1-26, NB via 7th, Left on Poplar, Left on 8th, Reg Rt, Layover on 8th & Poplar
Route: 47M-Whitmn Plz to 7th-Spg Grd via 9thSt
PWD Started Mon Apr 27 Until Mon Jun 1
9am - 430pm until 6-1-26, SB via 8th, Left on Brown, Right on 6th, Right on Spring Garden, Left on 8th, Reg Rt
Route: 47-Whitman Plaza to 5th-Godfrey
PWD Started Mon Apr 27 Until Mon Jun 1
9am - 430pm until 6-1-26, SB via 8th, Left on Brown, Right on 6th, Right on Spring Garden, Left on 8th, Reg RT
Route: 47M-Whitmn Plz to 7th-Spg Grd via 9thSt
PGW Started Thu Apr 16 Until Tue Jun 2
Until 6-2-26 From 07:00 to, 3:00pm weekdays only.., WB via Parkside, Left on 52nd, Right on Jefferson, Reg. Rt.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Construction Started Wed Dec 3 Until Wed Jun 3
Discontinued Transit Stop, SB at Broad and Erie until, 06-03-2026
Route: 16-City Hall to Cheltenham-Ogontz
Sink hole Started Mon May 4 Until Thu Jun 4
Until 5am 6/4/26, SB via Aramingo av, Right on York, Left on Frankford, Reg Rte
Route: 25-Frankford TC to Columbus Commons
Construction Started Fri Apr 17 Until Wed Jun 17
Discontinued Transit Stop, EB at 30th & Grays Ferry, until 06-17-2026
Route: 12-Columbus-Dock to 50th-Woodland
Construction Started Mon Apr 27 Until Sat Jun 20
24/7 until 06-20-26, SB via 5th, Left on Luzerne, Right on Front, Right on Erie, Left on 2nd, Right on Glenwood, Left on 6th, Reg Rt
Route: 47-Whitman Plaza to 5th-Godfrey
Construction Started Thu Apr 16 Until Fri Jun 26
Weekdays 9am -, 3pm NB via Newtown, Bypass & Pine/Newton, Langhorne, Right on Newtown Bypass, Left on Penns Trail, Left on Phesant Run, Right on Terry Dr, Left on Newtown/Yardley, (Washington St) Reg Rt
Route: 130-BCCC to Frankford-Knights
Construction Started Thu Apr 16 Until Fri Jun 26
Weekdays 9am - 3pm Until, 6/26/26, SB via Washington st, Right on Terry Dr, Left on Phesant, Right on Penns Trail Dr, Right on Newtown Bypass, Left on Route 413S, Reg Rte, Gloria Dei will be bypassed
Route: 130-BCCC to Frankford-Knights
Discontinued Transit Stop Started Thu Jan 22 Until Wed Jul 1
until 07-01-2026, WB Transit Stop, Discontinued, at 13th & Market St
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Discontinued Transit Stop Started Thu Jan 22 Until Wed Jul 1
until 07-01-2026, WB Transit Stop, at 8th & Market St, Accommodate all, passengers at the route 44, and route 38 transit stop
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Down Wires Started Mon Mar 30 Until Wed Jul 1
Discontinue Transit Stop, At Leo Mall Drv & Bustleton, Ave
Route: 58-Neshaminy/Somerton to Frankford TC
Construction Started Tue Apr 14 Until Sun Jul 26
7am - 4pm Mon thru Fri, 7-26-26, SB via Ridge, Reg Rt
Route: 35-Manayunk Roxborough Loop
Discontinued Transit Stop Started Tue Apr 21 Until Mon Aug 31
Discontinue the Transit, Stop at Schuylkill & Market, Until Further Notice
Routes: 9-4th-Walnut to Andorra, 44-Front-Market to Ardmore, 49-33rd-Dauphin to 29th-Snyder, 62-9th-Market to Andorra, 124-Chesterbrook to 13th-Market, 125-Valley Forge to 13th-Market
Construction Started Mon May 4 Until Tue Sep 1
Until 8am 9/1/26, WB via Kensington av, Right on Glenwood, Reg Rt
Route: 89-Front-Dauphin to Arrott Transit Ctr
Construction Started Mon May 4 Until Tue Sep 1
Until 8am 9/1/26, EB via via Glenwood av, Left on Kensington, Reg Rt
Route: 89-Front-Dauphin to Arrott Transit Ctr
Construction Started Mon Mar 16 Until Tue Sep 1
Mon - Fri, 8am - 4pm until 9/1/26, NB via Township Line Rd, Right on West Chester Pk, Right on Darby Rd, Reg Rt
Route: 103-Ardmore to 69th St Transit Center
Construction Started Mon Mar 16 Until Tue Sep 1
Mon - Fri, 8am - 4pm until 9/1/26, SB via Darby Rd, Left on West Chester Pk, Left on Township Line Rd, Reg Rt
Route: 103-Ardmore to 69th St Transit Center
Construnction Started Until Fri Sep 4
24/7 until 11:59pm on 9/4/26, NB via Oregon, Right on 11th, Right on Passyunk, Left on 9th, Reg Rt
Route: 47M-Whitmn Plz to 7th-Spg Grd via 9thSt
Phoenixville Open Air Event  Started Fri May 1 Until Mon Oct 26
2:30pm - 7pm Friday thru, Mon on 5/1/26 - 10/26/26, WB Via Bridge St, Left on Starr St, Right on Second Ave, Right on Main St, Reg Route
Route: 99-Phoenixville to Norristown TC
Phoenixville Open Air Event  Started Fri May 1 Until Mon Oct 26
2:30pm - 7pm Friday thru, Mon on 5/1/26 - 10/26/26, WB: via Main St, Left on High St, Reg Rt
Route: 139-Limerick to King of Prussia
Phoenixville Open Air Event  Started Fri May 1 Until Mon Oct 26
2:30pm - 7pm Friday thru, Mon on 5/1/26 - 10/26/26, EB via High St, Right on Main St, Reg Rt
Route: 139-Limerick to King of Prussia
Roadwork Started Tue Nov 25 Until Thu Nov 26 2026
8am -3pm weekdays, until 1-26-26, WB via Crescentville Rd, Left on Hammond, Right on Nedro, Right on Front St, Reg Rt
Route: K-Ridge-Midvale to Arrott Transit Ctr
Weight Restriction Started Mon Apr 27 Until Sat Dec 26 2026
Sun - Sat until 12-26-26, NB via Frankford Ave, L - Wheatsheaf, Right on Kensington, Right on Torresdale, L - Frankford Ave, Reg Rt
Route: 5-2nd-Market to Frankford Transit Ctr
Construction Started Fri Sep 5 2025 Until Thu Dec 31 2026
until 6-30-2026, Discontinued Transit Stop, NB at Broad & Arch st, Accommodate Passengers, at Broad & Race st . DO, NOT SERVICE THIS, LOCATION
Routes: 4-Broad-Pattison to Fern Rock TC, 16-City Hall to Cheltenham-Ogontz
construction Started Thu Apr 23 Until Thu Dec 31 2026
Discontinued Transit Stop, EB at Lehigh and Lawrence, Until 12/31/2026
Routes: 39-Richmond-Cumberland to 33rd-Dauphin, 54-Richmond-Cambria to 33rd-Dauphin
Sinkhole Started Mon Jan 26 Until Thu Dec 31 2026
Until 12pm Thurs 12/31/26, WB via 48th St, Left on Brown St, Right on 49th St, Right on Westminster Ave, Reg Rt
Route: 64-50th-Parkside to Pier 70
Construction Started Mon Jan 5 Until Thu Dec 31 2026
*****Until Further Notice*****, EB via Island Avenue, Right on Penroase Plaza Road, Right on Mario Lanza Blvd, Right on Lindbergh Blvd, Left on Island Avenue, Reg Route
Route: T5 BUS-13th St to 80th St/Eastwick Bus
Construction Started Wed Mar 11 Until Thu Dec 31 2026
Discontinued Transit Stop, EB at 2nd & Washington, until 12-31-2026
Route: 64-50th-Parkside to Pier 70
Sinking Street Started Mon Mar 30 Until Thu Dec 31 2026
24/7 until 12-31-2026, Far side stop Northbound, @ Bustleton & Hartel
Route: 58-Neshaminy/Somerton to Frankford TC
Construction Started Wed Jun 4 2025 Until Fri Jan 1 2027
24/7 Detour From, 02/14/2025-01/2027, Via 38th, Alight At 38th & Filbert, Right on Warren, Right on 37th, Right on Cutberth, Left on 38th, Temp Stop At 38th & Filbert, Reg Rt
Route: LUCYGO-Gold Loop through University City
Construction Started Mon Apr 20 Until Fri Jan 1 2027
24-7 1-1-27, WB via Market, Right on 38th, Reg Rt
Route: LUCYGR-Green Loop through University City
Construction Started Wed Mar 4 Until Fri Jan 1 2027
Until Further Notice, discontinue stop WB at, Anne d` Harnoncourt (First, Stop)drive inside the Art, Museum
Route: 38-5th-Market to Wissahickon TC
Construction Started Thu Dec 4 Until Tue Jun 1 2027
Until 06-01-2027, Discontinued stop EB 34th, Market
Route: LUCYGO-Gold Loop through University City
Discontinued Transit Started Thu Dec 4 Until Tue Jun 1 2027
Sun - Sat until 6/1/27, EB Transit Stop is, DISCONTINUED, on, Market St at 34th St
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Transit Stop Removal Started Sun Apr 5 Until Mon May 1 2028
Discontinued Transit Stop, At Easton & Old York Rd, North & Southbound, Until 05/01/2028
Route: 55-Doylestown/Willow Grove to Olney TC
Transit Stop Removal Started Sun Apr 5 Until Mon May 1 2028
Discontinued Transit Stop, At Easton & Old York Rd, Until 05/01/2028
Route: 22-Warminster/Willow Grove to Olney TC
CONSTRUCTION Started Tue Feb 24 Until Wed May 31 2028
Until 5-31-28, SB via Front, Left on Arch, Left on 6th, Right on MarketReg Rt
Route: 17-Front-Mkt to 20-Johnston/Broad-Pat
Construction Started Wed Apr 8 Until Mon Jan 1 2029
until 1/1/2029, SB via 2nd, Right on Arch, Left on 4th, Left on Market, Left on Front st -Layover on, Front st.
Route: 5-2nd-Market to Frankford Transit Ctr
Traffic Pattern Started Fri Mar 6 Until Wed Mar 6 2030
7am -4pm weekdays, unti 3-6-30, EB via Loney, Right on Fillmore St,, Right on Huntingdon Pike, Left on Rhawn, Reg Rt
Route: 490-Fox Chase Loop to Verree-Marchman
Construction Started Mon Feb 2 Until Sat Mar 1 2031
until 3-1-31 discontinue, transit stop NB at 2nd &, Market due to construction
Route: 17-Front-Mkt to 20-Johnston/Broad-Pat
Construction Started Fri Nov 14 Until Wed Dec 31 2031
Until Further Notice, Discontinue transit stop NB, at Alan Wood Rd & Ridge, Pk due to construction, Pick up and Drop off, Passengers Across From, Bus Shelter On Alan Wood, Rd
Route: 95-Gulph Mills to Willow Grove Mall
Construction Started Thu Nov 20 Until Wed Dec 31 2031
Until Further Notice, Discontinue transit stop EB, at Alan Wood Rd & Ridge, Pk due to construction, Pick up and Drop off, Passengers Across From, Bus Shelter On Alan Wood, Rd
Route: 97-Chestnut Hill to Norristown TC
Trip cancellation for trip 734759.
Trip cancellation for trip 734759.
Route: 1-Parx Casino to 54th-City
Trip cancellation for trip 734787.
Trip cancellation for trip 734787.
Route: 1-Parx Casino to 54th-City
Trip cancellation for trip 734769.
Trip cancellation for trip 734769.
Route: 1-Parx Casino to 54th-City
Trip cancellation for trip 702382.
Trip cancellation for trip 702382.
Route: 109-Chester Transit Ctr to 69th St TC
Trip cancellation for trip 702435.
Trip cancellation for trip 702435.
Route: 109-Chester Transit Ctr to 69th St TC
Trip cancellation for trip 657817.
Trip cancellation for trip 657817.
Route: 14-FTC to Neshaminy/Oxford Valley
Trip cancellation for trip 661192.
Trip cancellation for trip 661192.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661056.
Trip cancellation for trip 661056.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661184.
Trip cancellation for trip 661184.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661103.
Trip cancellation for trip 661103.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661173.
Trip cancellation for trip 661173.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661108.
Trip cancellation for trip 661108.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661179.
Trip cancellation for trip 661179.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661131.
Trip cancellation for trip 661131.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661216.
Trip cancellation for trip 661216.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661136.
Trip cancellation for trip 661136.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661145.
Trip cancellation for trip 661145.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661237.
Trip cancellation for trip 661237.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661061.
Trip cancellation for trip 661061.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661197.
Trip cancellation for trip 661197.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661153.
Trip cancellation for trip 661153.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661176.
Trip cancellation for trip 661176.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661110.
Trip cancellation for trip 661110.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 661214.
Trip cancellation for trip 661214.
Route: 21-Columbus-Dock to 69th St TC
Trip cancellation for trip 750374.
Trip cancellation for trip 750374.
Route: 33-5th-Market to 23rd-Venango
Trip cancellation for trip 750252.
Trip cancellation for trip 750252.
Route: 33-5th-Market to 23rd-Venango
Trip cancellation for trip 750254.
Trip cancellation for trip 750254.
Route: 33-5th-Market to 23rd-Venango
Trip cancellation for trip 750376.
Trip cancellation for trip 750376.
Route: 33-5th-Market to 23rd-Venango
Trip cancellation for trip 750296.
Trip cancellation for trip 750296.
Route: 33-5th-Market to 23rd-Venango
Trip cancellation for trip 750378.
Trip cancellation for trip 750378.
Route: 33-5th-Market to 23rd-Venango
Trip cancellation for trip 668552.
Trip cancellation for trip 668552.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 668514.
Trip cancellation for trip 668514.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 668560.
Trip cancellation for trip 668560.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 668555.
Trip cancellation for trip 668555.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 668431.
Trip cancellation for trip 668431.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 668447.
Trip cancellation for trip 668447.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 668456.
Trip cancellation for trip 668456.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 668453.
Trip cancellation for trip 668453.
Route: 40-2nd-Lombard to Conshohocken-Monumnt
Trip cancellation for trip 745168.
Trip cancellation for trip 745168.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745189.
Trip cancellation for trip 745189.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745094.
Trip cancellation for trip 745094.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745150.
Trip cancellation for trip 745150.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745092.
Trip cancellation for trip 745092.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745209.
Trip cancellation for trip 745209.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745130.
Trip cancellation for trip 745130.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745174.
Trip cancellation for trip 745174.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745128.
Trip cancellation for trip 745128.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745172.
Trip cancellation for trip 745172.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745126.
Trip cancellation for trip 745126.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745170.
Trip cancellation for trip 745170.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745125.
Trip cancellation for trip 745125.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745169.
Trip cancellation for trip 745169.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 745124.
Trip cancellation for trip 745124.
Route: 46-58th-Baltimore to 63rd-Malvern
Trip cancellation for trip 683652.
Trip cancellation for trip 683652.
Route: 7-Pier 70 to 33rd-Dauphin
Trip cancellation for trip 683579.
Trip cancellation for trip 683579.
Route: 7-Pier 70 to 33rd-Dauphin
Trip cancellation for trip 689649.
Trip cancellation for trip 689649.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Trip cancellation for trip 689639.
Trip cancellation for trip 689639.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Trip cancellation for trip 689659.
Trip cancellation for trip 689659.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Trip cancellation for trip 689651.
Trip cancellation for trip 689651.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Trip cancellation for trip 689631.
Trip cancellation for trip 689631.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Trip cancellation for trip 689644.
Trip cancellation for trip 689644.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Trip cancellation for trip 689661.
Trip cancellation for trip 689661.
Route: L1 OWL-Midnight-5am Service (Bus) for L1
Media-Sharon Hill Line is Now the “D” Started Thu Dec 12 2024
The Media-Sharon Hill Line is now the “D” as part of system-wide wayfinding improvements. The 101 is the D1, and the 102 is the D2. Expect to see both old and new language used through the transition. Learn more at septa.org/metro.
Routes: D1-Route 101, D2-Route 102
Norristown High Speed Line is Now the “M” Started Thu Dec 12 2024
The Norristown High Speed Line is now the “M” as part of system-wide wayfinding improvements. Expect to see both old and new language used through the transition. Learn more at septa.org/metro.
Route: M1-Norristown High Speed Line Local
2nd Street Station Westbound Platform Elevator Out of Service Starts Mon May 11 Until Fri May 15
The westbound platform elevator at 2nd Street Station is temporarily out of service. For accessible westbound travel, riders are advised to utilize 5th St/Independence Hall Station.
Route: L1-Market-Frankford Line All Stops
Route 139 Saturday Schedule Change Started Sat Mar 14
As of Saturday, March 14, the last trip westbound to Limerick on Saturdays only will be extended to Ridge Pk & Township Line Rd and operate up to 2 minutes earlier. The last trip to King of Prussia departing Ridge Pk & Township Line Rd at 10:40 pm will operate up to 5 minutes later. For complete schedule details, please refer to the PDF schedule available at septa.org/schedules.
Route: 139-Limerick to King of Prussia