Agencies » Boston MBTA

Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Routes: SL3-Chelsea Station - South Station, SL1-Logan Airport Terminals - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station
Courthouse Escalator 417 (Airport/Design Center platform to south lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Routes: SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station
Bowdoin Escalator 125 (Lobby to street) is unavailable until further notice pending replacement. Started Tue Mar 15 2022
The escalator will remain out of service for the foreseeable future. This decision was made after a thorough inspection determined that corrosion on the escalator’s steel truss was so severe that it could not be repaired further and that a complete replacement of the escalator would be required. Replacing the escalator at this location requires a more extended unit meeting modern escalator safety requirements. This longer unit will require significant alteration to the station entrance to meet code requirements. The MBTA has currently begun design work to understand what station upgrades will be needed.

Due to these complexities, we expect the escalator will remain out of service for a significant time. We recognize the challenges this poses to our riders, and please know we are working to identify a solution as quickly as possible. In the meantime, Government Center Station, which is fully accessible and serves the Blue Line, is under a quarter-mile from Bowdoin Station.
Route: Blue Line
Andrew Escalator 123 (Ashmont/Braintree platform to busway) is unavailable until further notice pending replacement. Started Wed Mar 22 2023
Route: Red Line
Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable Started Thu Jun 13 2024
Route: Haverhill Line
State Escalator 6 (Oak Grove platform to Old State House lobby) unavailable Started Mon Mar 31 2025
Route: Orange Line
Malden Center Escalator 312 (Street level to Commuter Rail platform) unavailable due to maintenance. Started Wed Apr 23 2025
Route: Haverhill Line
Ruggles Escalator 136 (Orange Line platform to upper lobby) unavailable Started Thu Jul 31 2025
Route: Orange Line
Chinatown Elevator 876 (Oak Grove platform to Washington St, Essex St) unavailable due to maintenance Started Mon Dec 29
To exit: get off the train at Tufts Medical Center. Go to the Washington St exit. At street level, cross Washington St. Take a Silver Line SL4 (South Station) or SL5 (Downtown) bus to Washington St and Essex St (Chinatown Station). Alternatively, if possible, travel 0.2 miles north on Washington St to Chinatown Station.


To board: go to the Silver Line SL5 bus stop at Washington St and Essex St. Take an SL5 (Downtown) bus to Tufts Medical Center (stay on bus past the Temple Pl stop).
Alternate route: travel 0.2 miles south on Washington St to Tufts Medical Center.
Route: Orange Line
North Station Escalator 447 (Passageway to Commuter Rail, TD Garden) unavailable due to maintenance Started Fri Jan 2
Routes: B-Green Line B, C-Green Line C, Orange Line, D-Green Line D, E-Green Line E
Porter Escalator 510 (Ashmont/Braintree platform to paid lobby) unavailable due to maintenance Started Wed Jan 7
Route: Red Line
Orient Heights Escalator 441 (Wonderland platform to pedestrian bridge) unavailable due to maintenance Started Thu Jan 15
Route: Blue Line
Tufts Medical Center Escalator 146 (Oak Grove platform to Washington Street lobby) unavailable from Mon Feb 2 through Fri Feb 13 due to maintenance Starts Mon Feb 2 Until Sat Feb 14
Route: Orange Line
Tufts Medical Center Escalator 147 (Forest Hills platform to Washington Street lobby) unavailable from Mon Feb 16 through Fri Feb 27 due to maintenance Starts Mon Feb 16 Until Sat Feb 28
Route: Orange Line
Central Escalator 360 (Alewife platform to street) unavailable from Mon Feb 2 through Fri Feb 20 due to maintenance Starts Mon Feb 2 Until Sat Feb 21
Route: Red Line
South Station Escalator 382 (Alewife platform to lobby) unavailable due to maintenance Started Sat Jan 24
Routes: SL1-Logan Airport Terminals - South Station, SLW-Silver Line Way - South Station, SL2-Design Center - South Station, SL3-Chelsea Station - South Station, Red Line
Alewife Escalator 349 (Platform to Russell Field) unavailable due to maintenance Started Thu Jan 29
Route: Red Line
Worcester Elevator 781 (Platform to pedestrian bridge) out of service until further notice. Please use the elevator from the main building to the platform at 2 Washington Sq. Started Fri Jan 30
Route: Framingham/Worcester Line
Harvard Escalator 512 (Mezzanine to Harvard Square) unavailable due to maintenance Started Fri Jan 30
Routes: 74-Belmont Center - Harvard via Concord Avenue, Red Line, 71-Watertown Square - Harvard Station, 75-Belmont Center - Harvard via Huron Avenue, 77-Arlington Heights - Harvard Station, 78-Arlmont Village - Harvard Station, 86-Harvard Square - Reservoir Station, 96-Medford Square - Harvard Station, 109-Linden Square - Harvard Square via Sullivan, 66-Harvard Square - Nubian Station, 73-Waverley Square - Harvard Station
North Station Escalator 304 (Oak Grove platform to Valenti Way lobby) unavailable due to maintenance Started Sat Jan 31
Route: Orange Line
World Trade Center Escalator 402 (Lobby to World Trade Center Avenue mezzanine) unavailable due to maintenance Started Sat Jan 31
Routes: SL1-Logan Airport Terminals - South Station, SL2-Design Center - South Station, SLW-Silver Line Way - South Station, SL3-Chelsea Station - South Station
World Trade Center Elevator 934 (Lobby to World Trade Center Avenue) unavailable due to maintenance Started Sat Jan 31
To access World Trade Center Ave from the lobby, use World Trade Center Elevator 935 to access the South Station platform. Take an SL1, SL2 or SL3 bus inbound to South Station, then proceed to the Route 7 bus stop located on Summer St. Take a Route 7 (City Point) bus to Summer St opposite WTC Ave. To access the lobby from World Trade Center Ave, travel south on World Trade Center Ave to the Route 7 bus stop at Summer St & WTC Ave, and take a Route 7 (Otis & Summer) bus to Summer St & Atlantic Ave. Proceed to the South Station Silver Line platform, then take an SL1, SL2 or SL3 bus outbound to World Trade Center and use World Trade Center Elevator 935.
Routes: SLW-Silver Line Way - South Station, SL2-Design Center - South Station, SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station
Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville until further notice. Started Mon Aug 4 2025
Affected direction: Outbound

Affected stops:
Readville
Routes 71 and 73 are detoured due to construction. The nearest connections are Mt Auburn St @ Mt Auburn Hospital or Mt Auburn St @ Traill St. Started Wed Aug 20
Affected stops:
Mt Auburn St @ Longfellow Rd (outbound)
Mt Auburn St @ Sparks St (outbound)
Mt Auburn St opp Sparks St (inbound)
Routes: 71-Watertown Square - Harvard Station, 73-Waverley Square - Harvard Station
On Saturday, January 31 & Sunday, February 1, there will be no Commuter Rail service between Needham Heights and South Station on the Needham Line. Passengers can use MBTA buses, Orange, and Green Line service as alternatives. Started Sat Jan 31 Until Mon Feb 2
-There will be no shuttle bus service alternatives or diversion schedule for this service change.
-Passengers may use Bus Routes 35, 36, and 37 between West Roxbury and Forest Hills for connections to Orange Line subway service between Forest Hills and Back Bay.
-Passengers may use Bus Route 59 between Needham Junction and Newton Highlands for connections to Green Line D branch subway service to Copley, which is less than a quarter mile away (or about a four-minute walk) from Back Bay.
-There will be no service at Hersey.
-Riders using Bus Routes 35, 36, 37, or 59 should budget extra travel time. For example, a rider traveling to South Station from West Roxbury should budget at least 35 minutes of travel in addition to their regular trip time.
-This allows for West Roxbury Parkway Bridge Replacement project, which will replace the bridge that carries the West Roxbury Parkway over the Needham Line.
Route: Needham Line
Route 11 outbound is being detoured on weekdays from 7 AM to 4 PM through Friday, February 27, for construction. Connections are available at W 7th St @ D St and E 8th St @ Dorchester St. Starts Fri Jan 29 2027 Until Fri Jan 29 2027
Affected direction: Outbound

Affected stops:
W 7th St @ E St
W 7th St @ F St
W 7th St @ Dorchester St
Route: 11-City Point - Chauncy Street & Summer Street
Orange Line: Shuttle buses will replace service between Jackson Square and Forest Hills from February 14 - 16 for signal upgrades. Starts Sat Feb 14 Until Tue Feb 17
Accessibility:
All shuttle buses will be accessible.

Fare-Free Commuter Rail Alternative:
Riders can use the Franklin/Foxboro, Needham, or Providence/Stoughton Lines fare-free for service between Forest Hills, Ruggles, Back Bay and South Station. The trip between Forest Hills and Back Bay on the Commuter Rail is approximately 10 minutes. Regular fares will apply to travel beyond Forest Hills.

Travel Time:
Riders using shuttle bus service should budget extra travel time. For example, a rider traveling to Downtown Crossing from Forest Hills should allow for at least 20 minutes of travel in addition to their regular commute.

Shuttle Bus Stops:

Jackson Square:
Columbus Ave @ Amory St (1579 Columbus Ave)

Stony Brook:
Northbound - Stony Brook Station
Southbound - Amory St @ Boylston St (207 Amory St)

Green Street:
Northbound - Amory St @ Green St (420 Amory St)
Southbound - Green St Station (465 Amory St)

Forest Hills:
Forest Hills Station (Lower Busway)
Route: Orange Line
Orange Line: Shuttle buses will replace service between Back Bay and Forest Hills from February 28 - March 8, for signal upgrades. Starts Sat Feb 28 Until Mon Mar 9
Accessibility:
All shuttle buses will be accessible.

Fare-Free Commuter Rail Alternative:
Riders can use the Franklin/Foxboro, Needham, or Providence/Stoughton Lines fare-free for service between Forest Hills, Ruggles, Back Bay and South Station. The trip between Forest Hills and Back Bay on the Commuter Rail is approximately 10 minutes. Regular fares will apply to travel beyond Forest Hills.

Travel Time:
Riders using shuttle bus service should budget extra travel time. For example, a rider traveling to Downtown Crossing from Forest Hills should allow for at least 30 minutes of travel in addition to their regular commute.

Shuttle Bus Stops:

Back Bay:
Northbound/Southbound - Back Bay Station (165 Dartmouth St)

Massachusetts Avenue:
Northbound - Columbus Ave @ Mass Ave (584 Columbus Ave)
Southbound - Columbus Ave @ Mass Ave (585 Columbus Ave)

Ruggles:
Northbound - Ruggles Station (Upper Busway)
Southbound - 1125 Tremont St

Roxbury Crossing:
Northbound - Columbus
Route: Orange Line
Route 92 detoured due to snow. Inbound: connections can be made at Main St @ W School St and N Washington St @ Medford St. Outbound: connections can be made at N Washington St @ Cooper St and Main St @ School St. Started Thu Jan 29
Affected stops:
Warren St @ Winthrop St (outbound)
Warren St @ Church St (outbound)
Main St @ Union St (inbound)
Main St @ Harvard St (inbound)
Main St @ City Sq (inbound)
Route: 92-Sullivan Square Station - Downtown via Main Street
Haverhill Line diversion this weekend, January 31 - February 1, will no longer take place and normal weekend service will be in effect. Started Sat Jan 31 Until Mon Feb 2
Route: Haverhill Line
Fitchburg Line diversion this weekend, January 31 - February 1, will no longer take place and normal weekend service will be in effect. Started Sat Jan 31 Until Mon Feb 2
Route: Fitchburg Line
Lowell Line diversion this weekend, January 31 - February 1, will no longer take place and normal weekend service will be in effect. Started Sat Jan 31 Until
Route: Lowell Line
Newburyport/Rockport Line diversion this weekend, January 31 - February 1, will no longer take place and normal weekend service will be in effect. Started Sat Jan 31 Until Mon Feb 2
Route: Newburyport/Rockport Line
Charlestown Ferry: Passengers should expect delays and potential cancellations all day Sunday, February 1, due to predicted stormy conditions. Started Until Mon Feb 2
Route: Boat-F4
Lynn Parking Garage is partially closed, but has sufficient parking capacity to accommodate daily demand. Started Thu Nov 4 2021
Routes: 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square, 441/442-Marblehead - Wonderland Station, 442-Marblehead - Wonderland Station via Humphrey Street, 455-Salem Depot - Wonderland Station, 456-Salem Depot - Central Square, Lynn, 436-Liberty Tree Mall - Central Square, Lynn via Goodwin Circle, 439-Nahant - Wonderland Station, 441-Marblehead - Wonderland Station via Paradise Road, 426-Central Square, Lynn - Haymarket or Wonderland Station, 429-Northgate Shopping Center - Central Square, Lynn
Hingham/Hull Ferry: Portions of the Town of Hull parking lot at the Hull ferry terminal are blocked off for sewer pump station construction work. More information is available at https://www.town.hull.ma.us/ Started Thu Jun 27 2024
Route: Boat-F1
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1 2025
Routes: SL1-Logan Airport Terminals - South Station, SL3-Chelsea Station - South Station, SLW-Silver Line Way - South Station, Fairmount Line, Foxboro Event Service, SL2-Design Center - South Station, Franklin/Foxboro Line, Red Line, Kingston Line, Fall River/New Bedford Line, Framingham/Worcester Line, Greenbush Line, Needham Line, Providence/Stoughton Line
Construction is ongoing in the Hingham Parking lot and on Shipyard Drive in preparation for the Hingham Ferry Dock upgrades. There is reduced parking in the lot, and portions of Shipyard Drive and driveways to and from the parking lot are affected Started Tue Aug 19
Route: Boat-F1
Route 59 will have additional service this weekend, January 31 - February 1, to accommodate Needham Branch Commuter Rail passengers between Newton Highlands and Needham Junction. Started Sat Jan 31 Until Mon Feb 2
Route: 59-Needham Junction - Watertown Square
The following stop is closed on weekdays from 7 AM to 4 PM through Saturday, Feb 28, due to roadway construction: Green St @ Magazine St (inbound). Please use Western Ave @ Green St. Starts Fri Feb 27 Until Fri Feb 27
Affected routes:
70
Route: 70-Market Place Drive or Waltham Center - University Park
The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance. Started Fri Jun 30 2023
Affected lines:
Fall River/New Bedford Line
Route: Fall River/New Bedford Line
Littleton/Route 495 passengers can expect occasional traffic and detours accessing the station due to the Foster Street reconstruction work. Started Wed Feb 5 2025
Scheduled to complete sometime in 2027, the Reconstruction of Foster Street includes widening and resurfacing with the addition of bicycle lanes.
Route: Fitchburg Line
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. Started Fri Feb 28 2025
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.
Route: Framingham/Worcester Line
Jackson Square: The stairway connecting the Jackson Sq lobby and the south end of the platform is closed until winter 2026. Use the stairway at the north end of the platform. This closure is for the construction of a new stairway and a second elevator. Started Mon Jun 30 2025
Route: Orange Line
To accommodate Providence Station Renovations, construction barriers have been installed and the Southern stairwell to Track 1 is out of service. Staircase access to Track 3 and Track 5 are now open. Started Thu Jul 17 2025
Affected lines:
Providence/Stoughton Line
Foxboro (Special Events)
Routes: Foxboro Event Service, Providence/Stoughton Line
Jackson Square: The platform is undergoing renovations to improve safety and accessibility. Sections of the platform are unlevel, which may make it difficult for some riders to board and exit trains. Started Sat Sep 27
Please see station personnel or use a station call box to request assistance.
Route: Orange Line
Market St @ Tremont St (inbound & outbound) is closed until further notice due to construction. Riders of the 426, 429, 441, 442, 455 can board at S Common St @ Market St. Riders of the 435 can board at Tremont St opp St Mary's High School. Started Sun Dec 14
Affected routes:
426
429
435
441
442
455
Routes: 426-Central Square, Lynn - Haymarket or Wonderland Station, 429-Northgate Shopping Center - Central Square, Lynn, 435-Liberty Tree Mall - Central Square, Lynn via Peabody Square, 441-Marblehead - Wonderland Station via Paradise Road, 441/442-Marblehead - Wonderland Station, 442-Marblehead - Wonderland Station via Humphrey Street, 455-Salem Depot - Wonderland Station
Fare gates at South Station have begun being activated incrementally. Riders will need to tap or scan to exit and enter the track area. Visit MBTA.com/CRGATES for more information. Started Tue Dec 30
Routes: Franklin/Foxboro Line, Greenbush Line, Kingston Line, Needham Line, Fall River/New Bedford Line, Providence/Stoughton Line, Framingham/Worcester Line
Fare gates at South Station have begun being activated incrementally. Riders may need to tap/scan to exit & enter the track area. CharlieCard users: validate cards at South Station vending machine or with conductor. Started Tue Dec 30
-Extra staff will be onsite to assist.
-Visit MBTA.com/CRGATES for more information.
-Fairmount Line riders paying with a CharlieCard must validate their fare before entering or exiting the fare gates.
-If your trip begins at South Station, validate your CharlieCard at the fare vending machines near the station's ticket office. You'll then be able to tap your CharlieCard at the gate.
-If your trip ends at South Station, you'll need to see a conductor onboard or staff on the station platform to get an exit ticket. You'll scan this ticket at a reader to exit the gate.
-Fairmount Line Zone 1A stations will receive new Fare Vending Machines for CharlieCard validation for Commuter Rail use.
Route: Fairmount Line
Broadway @ Temple St (outbound) has moved due to construction. The stop is relocated to Grant St, in front of 281 Broadway. Started Fri Jan 16 Until Mon Apr 6
Affected routes:
89
101
Routes: 101-Malden Center Station - Sullivan Square Station via Winter Hill, 89-Clarendon Hill or Davis Station - Sullivan Square Station, 89/93-Clarendon Hill - Haymarket Station
Northern Ave @ Tide St (inbound & outbound) stop is closed from 4:00 AM to 6:00 PM on Sat, Jan 31 & Sun, Feb 1, due to construction. Riders can use the alternate stop located at 23 Drydock Ave. Started Until Sun Feb 1
Affected routes:
Silver Line - SL2
4
Routes: 4-North Station - Design Center, SL2-Design Center - South Station, SLW-Silver Line Way - South Station
This weekend's scheduled Red Line work between Broadway and North Quincy & Broadway and Ashmont has been cancelled due to the lingering impacts of the recent winter storm, and the potential weather for the weekend. Started Wed Jan 28 Until Mon Feb 2
Route: Red Line
The following stop is closed on weekdays from 7 AM to 4 PM through Friday, Feb 27, due to construction: Franklin St @ Sidney St. Riders can use the temporary stop at Sidney St @ Green St. Starts Fri Feb 27 Until Fri Feb 27
Affected routes:
70
Route: 70-Market Place Drive or Waltham Center - University Park