Current time: Refresh

Agencies » New York MTA

 •  SIM6-Eltingville - Midtown Manhattan Express

 
Vehicles
 

Remove ads by becoming a Premium User

All Staten Island express, limited, local and select buses are running with delays in both directions while we recover from the winter storm.

Started

Allow additional travel time.

Vehicle 2554 16:48 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds
at Transit Center on Eltingville In long layover, last seen 3:03

Vehicle 1623 44:20 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds
at Transit Center on Eltingville Last seen 56:31

Vehicle 2700 38:11 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds
at Transit Center on Eltingville In long layover, last seen 11:40

Vehicle 1715 11:37 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds Many Seats Riders: 5
past Amboy Rd on Nelson Av

Vehicle 1663 0:38 ahead of going Eltvlle Trans Ctr via F Cap Bl via Gfrds Standing Room Riders: 27
aprchg Lincoln Av on Hylan Blvd

Vehicle 1606 16:25 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds
aprchg 6 av on gowanus py

Vehicle 2594 13:24 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds Standing Room Riders: 42
past battery pl on fdr

Vehicle 1614 4:53 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds Standing Room Riders: 32
past 1 Av on E 23 St

Vehicle 1651 23:12 behind going Eltvlle Trans Ctr via F Cap Bl via Gfrds Few Seats Riders: 22
aprchg E 34 St on Lexington Av

Missing vehicles

Scheduled to be at E 53 St on Lexington Av going to Eltvlle Trans Ctr via F Cap Bl via Gfrds.

Scheduled to be at E 41 St on Lexington Av going to Eltvlle Trans Ctr via F Cap Bl via Gfrds.

Scheduled to be at 3 Av on E 23 St going to Eltvlle Trans Ctr via F Cap Bl via Gfrds.

Scheduled to be at Monticello Terr on Nelson Av going to Eltvlle Trans Ctr via F Cap Bl via Gfrds.

Leaflet | Map data © OpenStreetMap contributors

Southbound SIM6 and SIM11 buses are skipping the stop on Lexington Ave at E 45th St - use the temporary stop on Lexington Ave at E 43rd St instead

Started Wed Dec 4 2024 Until Sun Jun 14

What's happening?

Water main construction