Current time: Refresh
Agencies » Boston MBTA
• Framingham/Worcester Line
Remove ads by becoming a Premium User
Starts Thu Apr 23 Until Thu Apr 23
Affected stations:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.