Current time: Refresh
Agencies » Manchester Bee Network
• 2-Piccadilly - Shudehill circular
Remove ads by becoming a Premium User
Vehicle 66079 2:19 behind going Manchester Piccadilly Rail Station
aprchg Cheapside on King Street
Vehicle 66082 3:56 behind going Manchester Piccadilly Rail Station
past Piccadilly Gardens on Piccadilly
Vehicle 66077 0:34 behind going Manchester Piccadilly Rail Station
near Manchester Piccadilly Rail Station on Piccadilly Station Approach
Vehicle 66072 Waiting 1:50:00. 6:41 behind going Manchester Piccadilly Rail Station
past Piccadilly Gardens on Piccadilly Last seen 1:49:42
Vehicle 66076 2:25 ahead of going Manchester Piccadilly Rail Station
at Shudehill Interchange on Shudehill
Leaflet | Map data © OpenStreetMap contributors
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
From Monday 19 January, there will be no access to the single-story park and ride at Oldham Mumps. Works will also take place at the multi-storey car park.
The escalator to exit Bury Metrolink stop is currently out of service. Please use the steps or follow the signage for the lift from platform level to the Interchange.
[View map of Bury tram stop](https://tfgm.com/travel-updates/live-departures/tram/bury-tram/station-map)
The bus stop on Market Street, near Exchange Street (Stop SB1877) will be closed for one year due to works taking place. As a result, the free bus 2 will use an alternative stop.
Due to the closure of Piccadilly Rail Station, the free bus 1 and 2 services will not serve Piccadilly Approach, and will start and terminate at Aytoun Street.
The bus stop at Tesco on High Street is closed due to works taking place.
The bus stops at Piccadilly, and the junction of Newton Street, Portland Street and Chatham Street are closed due to works taking place.
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.