Current time: Refresh

Agencies » Manchester Bee Network

 •  7-Stockport - Gorton — Droysld

 
Vehicles
 

Remove ads by becoming a Premium User

Vehicle BU25YXE Battery bus 0:02 ahead of going Stockport Interchange
aprchg Broadstone Mill on Broadstone Road

Vehicle BD74WJM Battery bus 0:24 ahead of going Stockport Interchange
at Royal Oak on Cross Lane

Vehicle BU25YWP Battery bus 3:40 behind going Ashton-under-Lyne Interchange
near Stockport Interchange

Vehicle BD74WHC Battery bus 10:37 behind going Ashton-under-Lyne Interchange
past Fir Tree School on Browning Road

Vehicle BD74WHA Battery bus 10:35 behind going Ashton-under-Lyne Interchange
past Ashton Old Road on Fairfield Road

Vehicle BD74WJV Battery bus 22:01 behind going Ashton-under-Lyne Interchange
aprchg Ashton-under-Lyne Interchange on Oldham Road

Leaflet | Map data © OpenStreetMap contributors

Whitefield Park and Ride Started Thu Jan 1 Until Tue Mar 31 (Updated Mon Dec 22 )
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
Oldham Mumps Park and Ride Started Mon Jan 19 (Updated Mon Jan 5 )
From Monday 19 January, there will be no access to the single-story park and ride at Oldham Mumps. Works will also take place at the multi-storey car park.
Keswick Road, Reddish - Bus Service Diversion Started Thu Feb 5 (Updated Fri Feb 6 )
Due to a large pot hole on Keswick Road, bus services are on diversion.
Bury Tram Stop - Escalator out of service Started (Updated )
The escalator to exit Bury Metrolink stop is currently out of service. Please use the steps or follow the signage for the lift from platform level to the Interchange.

[View map of Bury tram stop](https://tfgm.com/travel-updates/live-departures/tram/bury-tram/station-map)
High Street, Walkden - Bus Stop Closure Started Fri Jan 30 Until Wed Feb 11 (Updated Tue Jan 27 )
The bus stop at Tesco on High Street is closed due to works taking place.
Piccadilly Tram Stop - Escalator Works Starts Mon Feb 9 Until Sun Mar 22 (Updated Mon Jan 26 )
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.