Mississauga MiWay
• 10-Bristol
Leaflet | Map data © OpenStreetMap contributors
103 South - Stop 0723 on Hurontario St at the Queensway is relocated 25 metres south for LRT construction. The shelter will remain accessible for use.
10 North - Stop 3408 on Bristol Rd at Swiftcurrent Trail is closed for construction. Use the temporary stop at the asphalt pad 150 metres west.
Starting Monday, Sept. 1, the schedule for this route will be adjusted on weekdays, Saturdays and Sundays. Please check for updated schedules.
10 South - Stop 1610 Central Pky at Laurentian Ave will be relocated 20 metres north at 8 am Fri Aug 15 for construction.