Kitsap County construction projects will cause delays on Route 108–Bethel through the end of 2026. Starting on June 8, Route 108 riders should expect delays along Bethel Rd between Lund Ave and Sedgwick Rd. Construction is scheduled from 8:30 AM and 5:30 PM daily through the end of 2026.
Kitsap Transit will add extra unscheduled bus service on Route 108 during construction hours. Plan extra travel time. On-time connections are not guaranteed during construction.
Shown to now
- Click on the dots to get a link to the trip path for that trip.
- Zoom with mouse wheel or two figures and drag to scroll.
- Click on the legend to hide or show individual vehicles or "Hide all" or "Show all" below.
- Dot size indicates load, where available.