Agencies » Toronto TTC
• 512-St. Clair
Line 1 Yonge-University: There is no subway service between St Clair West and St Andrew stations due to planned track work. Shuttle buses are running. Started Until (Updated )
Line 1 Yonge-University: Trains are not stopping northbound at Dundas station due to a security incident. Started (Updated )
Jump to: →East
|
|
Line 1 Yonge-University: Delays southbound at Dundas station due to a security incident. Started (Updated )
Line 2 Bloor-Danforth Regular service has resumed between Victoria Park and Kennedy stations. Started Until (Updated )
Buses will not be entering Eglinton Station on June 20-21st and June 23rd-27th from 12:00-5:00 AM, due to planned work. Affected routes will be utilizing Berwick, Duplex, and Eglinton Avenue East, eastbound. Westbound service will be utilizing Eglinton, Yonge, Berwick, Duplex and Eglinton. See other service alerts. (Updated Fri Jun 20 )
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.