Agencies » Vancouver TransLink
• 3-Main/Waterfront Station
Jump to: ↓South
|
|
UPDATE 11:45 AM: Work is complete, stopped reopened early. Starts Mon Jun 30 Until Mon Jun 30
Stop 50250 Southbound Main St @ E 36 Ave is temporarily closed from Thu May 29 to Mon Jun 30 from 9:30 AM to 3:00 PM daily on weekdays only due to construction.
Stop 50250 Southbound Main St @ E 36 Ave is temporarily closed from Thu May 29 to Mon Jun 30 from 9:30 AM to 3:00 PM daily on weekdays only due to construction.
UPDATE: Stop 50852 Westbound W Hastings St @ Richards St is temporarily closed through Sat Jun 28 due to construction. Started Mon Jun 23 Until Sun Jun 29
Fare changes take affect July 1st. Some online trip planning may show updated fares in advance. Please visit TransLink.ca for current fare information. Started Until Tue Jul 1
Stop 52212 Westbound SE Marine Drive @ Main St is temporarily closed beginning Monday June 30. Please use new stop 60532 on other side of laneway Starts Mon Jun 30
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.