Agencies » Vancouver TransLink
• 3-Main/Waterfront Station
Jump to: ↓South
|
|
Stop 50250 Southbound Main St @ E 36 Ave is temporarily closed from Thu May 29 to Mon Jun 30 from 9:30 AM to 3:00 PM daily on weekdays only due to construction. Starts Mon Jun 30 Until Mon Jun 30
Stop 59041 Southbound Main St @ E 41 Ave has temporarily moved 85 metres further south from Wed May 28 through Fri Jun 6 due to construction. Started Wed May 28 Until Sat Jun 7
Premium tracking history reports and charts
View Operating Chart (last 3 hours only)
See the progress of all vehicles for a route. Delays, gaps and bunching can be easily seen.
See headway, rider average waiting time, speed, schedule adherence and passenger load (where available) for each stop.
See a list of trips for a route or a vehicle.
The agency messages in effect during a range of time.
Schedule/Headway Adherence Chart
See the distribution of schedule or headway adherence by stop for a branch.
See the distribution of each passenger load level by stop for a branch.
Map of locations where vehicles are delayed along the route.
See a list of vehicles that serve the chosen stop with scheduled headway, actual gap between vehicles as well as a scatter plot of gaps.
Choose two stop and see a list of travel times between them, as well as a scatter plot of the travel time.