Route 69 detoured from Mon Jul 14 to Wed Jul 16 between 7:00 AM and 4:00 PM due to construction. The nearest inbound connections are Cambridge St @ Fayette St and Cambridge St @ Norfolk St. Starts Wed Jul 16 Until Wed Jul 16 Affected stops:
Cambridge St @ Hampshire St (inbound)
Cambridge St @ Prospect St (inbound)Route 69 detoured due to construction (inbound only). Connections can be made at Cambridge St @ Hampshire St and Cambridge St @ Prospect St. Started Until Affected direction: Inbound
Affected stops:
Cambridge St @ Hampshire St
Cambridge St @ Prospect StMore...