Agencies » Boston MBTA
• Fall River/New Bedford Line
Fall River Line Train 1939 (7:29 pm from South Station) is operating 15-25 minutes behind schedule between Campello and Fall River due to train traffic. Started Until
Affected direction: Outbound
Affected direction: Outbound
Fall River Line Train 1942 (7:35 pm from Fall River Depot) has departed Fall River and is operating 15-25 minutes behind schedule. Started Until
Affected direction: Inbound
Affected direction: Inbound
Jump to: ↑North
|
|
|
|
|
|
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1
Fall River Line Train 1987 (7:54 pm from East Taunton) has been cancelled today. Passengers will be accommodated by shuttle bus service making all local stops to Fall River. Started Until
Affected direction: Outbound
Affected direction: Outbound
New Bedford Line Train 2038 (6:07 pm from New Bedford) is operating 5-15 minutes behind schedule between Middleborough and South Station. Started Until
Affected direction: Inbound
Affected direction: Inbound
The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance. Started Fri Jun 30 2023
Affected lines:
Fall River/New Bedford Line
Affected lines:
Fall River/New Bedford Line
Elevator #779 from the pedestrian bridge to the platform is temporarily out of service at East Taunton until further notice. Please use Elevator #778 at the opposite end of the station/platform. Started Sun Jun 29
Affected lines:
Fall River/New Bedford Line
Affected lines:
Fall River/New Bedford Line