Agencies » Boston MBTA
• Fall River/New Bedford Line
Jump to: ↑North
|
|
|
|
|
|
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1
Fall River Line Train 6922 (9:37 am from Fall River Depot) is operating 5-15 minutes behind schedule between East Taunton and South Station. Started Until
More...
More...
Fall River Line Train 6911 (9:50 am from South Station) is operating 5-15 minutes behind schedule between Campello and Fall River Depot. Started Until
More...
More...
The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance. Started Fri Jun 30 2023
Affected lines:
Fall River/New Bedford Line
Affected lines:
Fall River/New Bedford Line
Elevator #779 from the pedestrian bridge to the platform is temporarily out of service at East Taunton until further notice. Please use Elevator #778 at the opposite end of the station/platform. Started Sun Jun 29
Affected lines:
Fall River/New Bedford Line
Affected lines:
Fall River/New Bedford Line