Boston MBTA

 •  Framingham/Worcester Line

 
Map
 
Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville until further notice. Started Mon Aug 4
Affected direction: Outbound

Affected stops:
Readville
On the weekends of November 15-16 and 22-23, express and local shuttle buses will replace regular train service between Worcester and Framingham. Starts Sun Nov 23 Until Mon Nov 24
Framingham/Worcester Line Commuter Rail service will operate between Framingham and South Station only. Riders can take local or express shuttle buses between Framingham and Worcester.

Travel Time:
Riders using the shuttle buses should budget extra travel time. For example, a rider traveling to South Station from Worcester should budget at least 20 minutes of travel in addition to their regular trip time.

Accessibility Information:
There will be no accessible van replacement, as all shuttle buses are equipped with a wheelchair lift and all shuttle stops are accessible.

Worcester Union Station Information:
All shuttle buses will pick-up and drop-off at the Worcester Union Station Bus Terminal. Please use Bus Berth #3 at Union Station for inbound shuttle service towards Framingham.

Shuttle Stops

Worcester Union Station:
Worcester Union Station Bus Terminal (Berth #3)

Grafton:
Grafton Station Parking Lot

Westborough:
Westborough Station Parking Lot

Southborough:
Please board all Framingham/Worcester Line trains on the outbound platform (Track 7) at Lansdowne and Back Bay until further notice today. Started Until
Affected stops:
Back Bay
Lansdowne
Please now board Worcester Line Train 534 (10:00 am from Worcester) on the inbound platform (Track 2) at West Natick through Wellesley Farms today. Started Until
Affected direction: Inbound

Affected stops:
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley Farms
Please board all Framingham/Worcester Line trains on the outbound platform (Track 1) at Wellesley Farms through West Natick until further notice today. Started Until
Affected stops:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick

Leaflet | Map data © OpenStreetMap contributors

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1 2025
Worcester Line Train 534 (10:00 am from Worcester) has departed Worcester and is operating 5-15 minutes behind schedule. Started Until
Affected direction: Inbound
Worcester Line Train 529 (9:50 am from South Station) is operating 10-20 minutes behind schedule between Framingham and Worcester. Started Until
Affected direction: Outbound

Affected stops:
Wellesley Farms
Worcester
Worcester Line Train 533 (10:50 am from South Station) has departed South Station and is operating 5-15 minutes behind schedule. Started Until
Affected direction: Outbound
The Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. Started Mon Jan 24 2022
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. Started Fri Feb 28 2025
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.